Lighting
↗
| Item | Type | Quantity | Description | |
|---|---|---|---|---|
| Robin EspriteLIGHT-013 | Mode 1 | 23fixture | 27.8 kg per fixture. | |
| Robin LEDBeam 150LIGHT-014 | Mode 1 | 20fixture | 5.7 kg per fixture. | |
| Robin Tetra XLIGHT-015 | Mode 4 | 18fixture | 11.3 kg per fixture. | |
| Conventional PAR 64LIGHT-016 | 10 very narrow, 6 flood | 16fixture | 1.5 kg per fixture. | |
| Robin MegaPointeLIGHT-017 | Mode 1 | 11fixture | 22 kg per fixture. | |
| Robin SpiiderLIGHT-018 | Mode 2 | 10fixture | 13.3 kg per fixture. | |
| 2-Lite BlinderLIGHT-019 | — | 8fixture | 2 kg per fixture. | |
| Robe JDC1LIGHT-020 | Normal, 23 ch | 8fixture | 12 kg per fixture. | |
| Arena Par ZoomLIGHT-021 | — | 8fixture | 7.2 kg per fixture. | |
| Circle fixture spacingLIGHT-003 | — | 0.79m | Fixtures on the circle truss are spaced 0.79 m apart. | |
| Circle fixture countLIGHT-004 | Confirmed | 20fixture | Twenty fixtures on the circle truss, at the 0.79 m spacing dimensioned on CIRC 150. | |
| Lx bar spacingLIGHT-005 | — | — | Overhead LX bars spaced 3.50 m apart, with fixtures at 0.90 m centres on the upstage bar and 1.30 m centres on the downstage bar. | |
| Note. FINISH: BLACK. All truss in this rig - the 5.00 m circle, the six towers and the overhead LX bars - must be black. Natural aluminium, chrome, silver or grey truss is not acceptable. | ||||
| Tower fixture trimsLIGHT-006 | — | — | Fixture trim heights on the towers, dimensioned from deck - 1.00, 1.50, 2.00, 2.50, 3.00, 3.50 and 4.00 m across the six towers. | |
| Floor fixturesLIGHT-007 | Positions on FIX FLOOR | — | Floor fixture positions are set out on the FIX FLOOR drawing - across the deck and at the tower bases. Work from that sheet; it is under Drawings. | |
| Additional equipmentLIGHT-011 | Console, haze, data | — | MA2 Lite or full size console. Four Antari F7 or Unice haze machines, each with a fan. ArtNet from the MA2 to the keyboard position on CAT6, and an XLR from the sound desk to the MA2 carrying LTC SMPTE. | |